Page 5 - PerformanceMachine
P. 5

BRAKE TEST                               TESTING & QUALITY










                                                                    EACH PERFORMANCE MACHINE WHEEL AND
                                                                    BRAKE SYSTEM IS DESIGNED AND ENGINEERED TO
                                                                    SPECIFIC STANDARDS AND THOROUGHLY TESTED.
                                                                    STARTING WITH COMPUTER SIMULATED STRESS
            STOCK V-TWIN MOTORCYCLES ARE COMING OUT OF THE FACTORY WITH MORE
            HORSEPOWER ON TAP THAN EVER, RARELY DOES IT STAY THAT WAY, THOUGH   ANALYSIS, OUR ENGINEERS ASSESS EACH DESIGN.
            AND THE BULK OF THESE BIKES ARE UPGRADED WITH HIGH PERFORMANCE   BUT WE DON’T STOP THERE. WE QUANTIFY OUR
            PIPES, CAMS, AND CARBS AND OTHER GO FAST PARTS.  IN AN EFFORT TO
            INCREASE PERFORMANCE RIDERS OVERLOOK THE VERY SYSTEM DESIGNED TO   FINDINGS WITH DATA FROM PHYSICAL TESTING IN
            BRING IT TO A STOP. IN-HOUSE DYNO TESTING ENSURES THAT PM CALIPERS   OUR SOPHISTICATED IN-HOUSE TEST DEPARTMENT.
            MAINTAIN PROPER PRESSURE, DO NOT FLEX, PROVIDE SUPERIOR STOPPING   PM TESTS TO STRICT WORLD WIDE STANDARDS
            POWER,  AND  ALL  FUNCTIONING  PARTS  HOLD  UP  TO  DAILY  USE  TO  BRING
            YOUR MOTORCYCLE TO A STOP IN A SAFE DISTANCE.           SUCH AS JASO AND TUV.


                         1   CORNERING                                       2   RADIAL LOAD
















            PERFORMANCE MACHINE’S PHYSICAL TESTING BEGINS WITH OUR   NEXT, THE WHEEL IS LOADED ON OUR GIANT RADIAL LOAD TESTER
            CORNERING TEST WHERE WE REPRODUCE THE INCREDIBLE STRESS   WHICH SIMULATES A LOAD ON A TIRE/WHEEL ASSEMBLY IN A VERTICAL
            CREATED DURING CORNERING ON A MOTORCYCLE.  EACH WHEEL DESIGN   RIDING CONDITION AT 2.25 TIMES THE MAXIMUM TIRE LOAD FOR
            IS SUBJECTED TO THIS MECHANICAL TORTURE AND THEN EVALUATED FOR   100,000 CYCLES ON A FRONT WHEEL AND 500,000 ON A REAR WHEEL.
            DAMAGE.  THE WHEEL IS TESTED AT 2.25 TIMES THE MAXIMUM TIRE LOAD   THE WHEEL IS SPUN UP TO SPEED DURING THESE CYCLES THEN
            FOR 1,000,000 CYCLES.  IF A WHEEL DOES NOT SURVIVE THIS TEST OR  CHECKED FOR FLAWS BEFORE ENDURING THE NEXT PHYSICAL TEST.
            ANY OTHER TEST, IT IS SCRAPPED AND REDESIGNED.


                         3   TORSIONAL                                             4   IMPACT
















            THE THIRD TEST IN THE PM REPERTOIRE IS THE TORSION LOAD TESTER   THE FOURTH PHYSICAL TEST SENDS EACH PM WHEEL DESIGN TO OUR
            WHICH SIMULATES WHAT A WHEEL WOULD ENDURE IF YOU WERE SHIFTING   MASSIVE IMPACT TESTING UNIT WHICH SIMULATES THE POT HOLES AND
            AT WIDE OPEN THROTTLE OR HITTING THE BRAKES TO THE POINT OF   ROAD HAZARDS THAT A WHEEL IS SUBJECTED TO IN THE REAL WORLD.
            SKIDDING FOR 100,000 CYCLES WITH THE HEAVIEST AND MOST POWERFUL   WE WRAP EACH WHEEL DESIGN WITH A TIRE AND REPLICATE A HARD
            PRODUCTION BIKE.  LOAD SENSITIVE RAMS CYCLE BACK AND FORTH   EDGED HIT; THE WHEEL MUST RETAIN AIR PRESSURE FOR A SPECIFIED
            REPLICATING REAL WORLD STYLE TORTURE IN AN ATTEMPT TO RIP THE HUB   AMOUNT OF TIME IN ORDER TO PASS.  IF A WHEEL PASSES THIS FINAL
            OUT OF THE RIM.  EACH WHEEL DESIGN IS GIVEN THIS TORTURE TREATMENT   TEST IT LIVES TO SEE ANOTHER DAY AND
            BEFORE MOVING ON TO ITS FINAL PHYSICAL TEST.            MOVES INTO PRODUCTION.


                                                                     FORGING FORWARD  |  PERFORMANCE MACHINE          3
   1   2   3   4   5   6   7   8   9   10